Work OrderWO-1047
What should we make?
Make 40 steel cabinets.
- Cutting40
- Bending40
- Assembly40
- Packing40
The work order sets the product, quantity and planned manufacturing work. It links the job to the relevant materials and operations.
Bill of Materials (BOM) & Costing